Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
Empennage
6-5-2010
< Previous Log Entry
Next Log Entry >
Date:
6-5-2010
Number of Hours:
3.00
Manual Reference:
Page 6-8
Brief Description:
Substructure for the right elevator
Clecoed the E-610PP & E-611PP to the E-702 spar with the platenuts, where the where final drilled.
Prepared the E-703 rib and E-704 counterbalance rib where they were deburred, drilled and fluted.
Clecoed the E-709 to the E-702, drilled and deburred.
Clecoed the E-701-R to the understructure and drilled.
The WD-605-1-R was clecoed and drilled to the E-702 and E-709.
E-701-R skin final drilled to sub assembly.
All parts were then removed and primed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.